Showing posts with label Forestry. Show all posts
Showing posts with label Forestry. Show all posts

Monday, April 2, 2012

Blog updates

Please remember to keep your Forestry and Rail Transport blog up-to-date by posting at least once each week.  Your blog can be an excellent resource for your students as well as educators and students in other locations.  Your blog entries can contain information on the forest products or rail industries that you have learned from the presentations, guest speakers or your reading.  You can summarize things that you learned from viewing the DVDs that you have been given or from the books and other print materials.

Another great way to use your blog is to post thought provoking questions for your students.  You can ask them to describe why Shay, Climax and Heisler locomotives could ascend steep slopes that rod locomotives could not.  What are the advantages and disadvantages of rod and geared locomotives for different situations?  What major changes have taken place in the climax forests of West Virginia since the late 1800s and what factors influenced these changes?

The blogs that were produced by the coal project participants are in wide use throughout the state and across the country.  Those blogs are excellent documentation of the coal project and are great resources for teachers and students as well as individuals who are interested in coal.

Let’s make the blogs for the current project on Forestry and Rail Transport even better than last year’s blogs.

Thursday, March 29, 2012

Forestry & Rail Transport Field Trip – 21 April 2012 – Ritter Park

Plans are continuing for the Saturday field trip to Huntington’s Ritter Park.  A goal for the day are:
  • learn (or to refresh for the 2011 returnees) the water quality protocol;
  • document the diversity of trees in Ritter Park
  • estimate the board feet in example trees.
This is an all day outing at the park.  Lunch will be provided.
Specific information (time, meeting place, etc) will be announced on this blog as April 21 approaches.
For this session you will need the following items:

  1. Samsung Galaxy Tab (fully charged);
  2. Vernier LabQuest (fully charged) units will be provided for teachers who were not in the 2011 session
  3. All Vernier probes
  4. Tape measure (to determine DBH)
  5. Tree identification guides
Wear comfortable shoes and bring a change of shoes and socks in case you get wet (you will get wet).  Please dress with the unpredictable April weather in mind.  This trip will take place rain or shine.

Wednesday, March 21, 2012

DRAFT Itinerary for Summer 2012 Trip

The itinerary for the July 2012 trip to locations of interest for the West Virginia Forestry and Rail Transport Project is under development.

A draft of the trip itinerary is available for your review.  This draft itinerary is under development and is subject to change as plans continue to develop.

If you click on the LINK to access the draft itinerary, it will open in Dropbox.  If you wish to click the "Download" option, you can bring the document in as a Word file and can click the links to potential visit sites for the summer trip.